Norte III Final Disposal Environmental Complex

Through the company Tecsan, Benito Roggio Ambiental has been working since 1994 in the Norte III Final Disposal Environmental Complex of CEAMSE in the province of Buenos Aires, providing services such as construction of modules for final waste disposal, management and operation of the services, and planning and execution of other works and services.

Modules operated and completed by Tecsan

Norte III Module

It was commissioned in 1994, and terminated in December 2001. It has a surface of 60 hectares. A total of 10,500,000 Tn of waste corresponding to 15 municipalities was disposed of during its 7-year operation. It has a leachate treatment plant, with a processing capacity of 80 m3/daily.

Norte III Module A

It was commissioned in December 2001, and terminated in February 2006. It has a surface of 62 hectares. A total of 10,500,000 Tn of waste corresponding to 21 municipalities was disposed of during more than 5 years. The module has a 2,000 μ membrane and bentonite soil. The processing capacity of the leachate treatment plant was extended to 250 m3/daily. A 1.5-hectare Theme Park was planned and developed and a Composting Plant was built.

Norte III Module B

Su operación se inició en diciembre de 2005 y finalizó en junio de 2010. Cuenta con una superficie de 82,5 hectáreas y en esta superficie fueron dispuestos 14.832.000 Tn de residuos. El módulo cuenta impermeabilización con membrana PEAD de 2.000 µ. y suelo bentonítico. Es el primer módulo del complejo ambiental que cuenta con un sistema de colección automática del líquido lixiviado generado, el cuál es sometido a un tratamiento biológico y físico-químico. Cuenta con una planta de separación y clasificación de los residuos sólidos ingresados y en el módulo se realiza captura, tratamiento y aprovechamiento de Biogás.

Operation Module

Norte III Module C

- It was commissioned in March 2008. It is currently in operation.
- It has a surface of 100 hectares.
- It has a reception capacity of 18,600,000 tons.
- 420,000 Tn/monthly of waste.
- Served population: 27 municipalities
- 2,000 μ PEAD membrane waterproofing and bentonite soil.
- Automatic collection system of leachate.
- Capacity of the leachate treatment plant: 500 m³/daily (biological + physical/chemical treatment)
- Implementation of baling system and disposal. 
 

Other technologies developed by TECSAN at the Norte III Final Disposal Environmental Complex:

Baling
Location: Transfer Station of Pompeya, city of Buenos Aires, Argentina.
Technology: baling with compacting equipment and conveyor belts. Subsequent unloading at Landfill.
Equipment: Compactor and baler, semi-trailer truck, telehandler to stow.
Baling capacity: 50 to 60 tons / hour.
Sourced: waste from the city of Buenos Aires, partially sorted, (without bulky / inert contents.)

 

Composting Plant
Location: Norte III, Province of Buenos Aires, Argentina.
Technology: forced ventilation in silos.
Capacity: 2,000 tons / monthly.
Source: Fruit and vegetables waste and pruning waste.

 

Recycling Plant
Location: Norte III, Province of Buenos Aires, Argentina.
Technology: Manual separation plant by running time in conveyor belt, compression and baling. Bulk accumulation.
Capacity: 300 Tons / daily.